Yes, more clay has been added to Thomas and Sons. In fact the clay between the tracks has been completed.
I’ve even squeezed some clay around the point blades (switch blades), a rather fiddly job. There’s some cleaning up to do but I’m pleased to say the points still operate.
However, I’ve no idea if the locos will still run. When everything has dried I will give the track a good clean up and do a test run. Fingers crossed!